The Engineering Boss

Chapter 97 Rescue Project Completed 10%

Chen Yang is now stationed wholeheartedly on the rescue project, while other construction sites are making phone calls to inquire. Fortunately, nothing happened at other construction sites, and everything is proceeding in an orderly manner.

A new day is coming, and the rescue project is in full swing.

Zhou Xinjin called after nine o'clock in the morning.

Zhou Xinjin: "Chen Yang, how is it going? How much soil was pulled out yesterday?"

Chen Yang: "Yesterday, nearly 90 truckloads of mud and sand were pulled out during the day, and about 30 truckloads were pulled out at night, a total of more than 120 truckloads."

Zhou Xinjin: "Evening? Did you work overtime last night?"

Chen Yang: "I worked overtime from 8:00 p.m. to 11:00 p.m. yesterday. There were only three four-axle trucks pulling dirt. Since it was pulling dirt at night, the speed slowed down."

Zhou Xinjin: "It's really good to work overtime, but you must pay attention to safety at night. The risk factor of landslides is very high. Once a safety accident occurs, the loss outweighs the gain."

Chen Yang: "I will pay attention to this. I have specially arranged people to observe the situation of the mountain at night. Once there is an unknown situation, the people will be evacuated immediately, and the machinery will not be ignored."

Zhou Xinjin: "Haha, young people are bold. Okay, I'm just asking about the situation. When I report to my superiors, I have a clear idea. Remember, safety first, always keep in mind."

"Call me when the landslide is about to be cleaned up, so I can contact them to have a look at the site and then determine the next step."

Chen Yang: "Okay, I will contact you when the time comes."

At around ten o'clock in the morning, yesterday's faulty four-axle truck was finally repaired, and the five four-axle trucks pulling dirt turned into six four-axle trucks pulling dirt.

Since the scope of construction was expanded a lot yesterday, today two excavators were loaded to pull soil, and one excavator was used to clean up the landslide slope and remove some unstable areas so that the work below would be safer.

However, the excavator still has some limitations. The height of the landslide is tens of meters high, and the excavator can only clear out the areas that can be cleaned. The remaining empty soil can only be thought of in other ways.

Time passed slowly, and the mud and sand on the landslide section was decreasing little by little. According to the progress of construction, most of them should be cleared out on January 6.

"Little brother, do you need workers here?"

Chen Yang stood on the side of the road and watched the excavator working not far away. Suddenly, a middle-aged man who was nearly fifty years old came to Chen Yang and asked, and he took out a cigarette and handed it to him.

"Uncle, I don't smoke. We don't need workers here for the time being."

"Temporarily? Then when?"

"Probably...when the landslide mud and sand are all cleaned up, maybe some workers will be needed!" Chen Yang responded.

The middle-aged man said: "I'm not far away. I'm thinking about doing some work here. I want to come here and do some work. If you need workers, you can tell me, we are very good at work."

It's the people around here!

Maybe the next step of the construction process is to ask some workers to help. If we ask people nearby, we don't know if they can do it. We can only talk about it when the time comes.

"Okay, I will notify you when I need workers."

"Thank you, thank you. What is your phone number, I will remember one."

Chen Yang told the other party his phone number, and the other party left after chatting with Chen Yang for a few words.

A day passed in a blink of an eye, and Chen Yang calculated that the six four-axle carts pulled a total of more than 150 vehicles during the day, which was more than 60 vehicles more than yesterday during the day.

I still worked overtime at night and continued to work. I also worked overtime with an excavator, a loader, and three four-axle vehicles, and this night was nearly 20 more vehicles than the first night.

Latu, who has been working overtime for the past two days,

This made the landslide section advance nearly 30 to 40 meters, and the whole is nearly half completed.

On January 5th, the weather was cloudy.

At around four o'clock in the afternoon, when Chen Yang was directing the excavator to clean up the landslide, the long-lost transparent panel appeared in front of him:

[Main line task announcement: Contract a project of more than 4 million yuan and organize personnel to construct it--landslide rescue project]

[Reward for project completion: 4,375,520 yuan and six cents]

[Sub-task: within ten days (before January 10th) complete 10% of the contracted project progress】

[Completion reward: 10% of the project completion reward, one junior administrator, one junior surveyor, six junior workers]

Hey, 10% of the project has been completed so quickly!

Chen Yang didn't expect that this side mission would be completed before the mud and sand were pulled out. It seems that the overtime work these days has been rewarding from time to time.

But that's good too, there will be rewards for completing side missions, and what he lacks now is staff. This time, the rewards include a junior manager, a junior surveyor, and six workers. These are the talents he is currently in short supply. .

"Your end number xxxx card, January 5th, 16:16xx bank income (inter-bank transfer) 437052.06 yuan, balance 2495473.32 yuan [XX bank]"

Not bad, the money has come in!

Then the information on the transparent panel changes:

[Main line task announcement: Contract a project of more than 4 million yuan and organize personnel to construct it--landslide rescue project]

[Reward for project completion: 4,375,520 yuan and six cents]

[Sub-task: Complete 50% of the contracted project progress within 20 days (before January 25)]

[Completion reward: 50% of the project completion reward, one junior administrator, one junior construction worker, one junior material worker, and six junior workers]

It only takes 20 days to complete 40% of the project. It seems that the time is really tight!

However, this emergency project is more cost-effective than other projects. Considering that the total price of the villa project is only 1.25 million, and the construction period will take several months, while the emergency project is more than 4 million and only two months, this comparison will help you know who is the best deal .

With the system reward in hand, Chen Yang is even more motivated!

As night fell, the busy day was finally over, and Chen Yang was also a little tired.

"Brother Chen, after working overtime tonight, the road will be cleared at noon tomorrow at most. Can you remove a few of the six four-axle vehicles?" Hu Xiaojun approached Chen Yang and said after dinner.

Chen Yang was silent for a while, and then said: "We'll talk about it tomorrow after getting through it. If you want to remove it, first remove the four four-axle cars, and keep your car and the other car."

"Are the excavators and loaders going to be removed?"

"The excavator is not in a hurry to evacuate. I rent it on a monthly basis. I have only done a few days of work now. Wouldn't it be a loss if I evacuate it?" Chen Yang said.

"Then Brother Chen, the landslide's sand and soil have been pulled out, what should we do next?"

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like