On January 3, the weather turned cloudy, and the rescue project officially started today.

Since the temporary shelter was going to be built yesterday, Chen Yang and the others were busy until after nine o'clock in the evening.

The temporary residences are all rented steel pipes, and the place where everyone sleeps is also built with steel pipes. It is made of two six-meter-long steel pipes with a width of about 1.8 meters and is fixed side by side. It is about 60 to 70 centimeters high from the ground. Thick formwork, anyway, the sleeping space of each person is the size of a formwork.

The outside is wrapped with rain-proof and sunshade cloth, and a total of three big houses and a small house have been built. Each big house can sleep ten people, and the small house is reserved for people who cook. On the far left, The kitchen is set up on the open space outside.

Chen Yang did the math, and the cost of building such a simple temporary residence was almost 10,000 yuan, not including the things in the kitchen.

By the way, when the temporary shelter was being built yesterday, the last excavator finally approached the landslide site, and all three excavators have been in place so far.

At noon today, my sister's New Year's Day holiday was over. Since the rescue project officially started today, Chen Yang had to be on site to direct it himself, so he couldn't send his sister to No. 1 Middle School.

Before 7 o'clock in the morning, Chen Yang drove to the emergency project site alone. Since the cooks would arrive later, Chen Yang bought a breakfast for each of the staff on the way.

When Chen Yang came to the emergency construction site, it was only past eight o'clock in the morning, and it was close to nine o'clock after everyone had finished their breakfast.

The landslide section was about 100 meters long, and the entire road was buried by the landslide's sandy soil, and even most of it slipped below the road, making it difficult for people to pass normally.

Chen Yang immediately arranged for an excavator to drive an excavator road ahead to eliminate the dangerous and landslide-prone places, and then the second excavator moved forward a little bit to dig the mud and sand to the third excavator. The machine was transshipped, and the last excavator was used for loading.

Four four-axle trucks are waiting in line to be loaded, and the masters of two of them have not come yet, but this does not affect the construction. Currently, four four-axle trucks are enough, after all, the construction site has not yet expanded.

The loader was arranged to wait at the spoil site, and judging by the situation, the loader would be in a state of rest for a while, and the loader would not be able to do work until the four-axle truck reversed at least a dozen vehicles.

The progress was slow at the beginning, and it took an average of 13 or 14 minutes for the excavator to load a truckload of sand and soil, and the first two excavators were also carefully cleaning up the landslide, after all, safety is the most important thing.

For everyone's safety, Chen Yang specially arranged for a junior worker to go up to watch, and if any special circumstances or accidents happened, he would immediately notify the people below to evacuate, while the remaining junior worker was arranged to record the soil. number of cars.

Zhou Xinjin came to the construction site at about ten o'clock, saw the construction site started and said a few words to Chen Yang briefly, then took a few photos and left.

But Zhou Xinjin didn't leave for a while, the cooking aunt contacted by Master Siqiaoche arrived, and because the other party got off at the closed road in front of the car, Chen Yang had to drive to pick her up.

Thinking that the junior workers bought some rice and noodles when they came back yesterday, and didn't buy any vegetables at all, Chen Yang simply took him to the nearest town to buy vegetables after receiving the aunt who cooked the rice.

Chen Yang, who was shopping for vegetables on the street, didn't dare to waste too much time. He bought a lot of vegetables in about half an hour, and then went straight to the temporary residence for his aunt to cook.

"How many cars have you pulled in total?" Chen Yang asked the junior worker who recorded the number of cars.

"Boss, the four four-axle trucks at the beginning were pulled three times on average, and the two four-axle trucks that came later were pulled only once each, a total of fifteen times." The junior worker replied.

It was after eleven o'clock in the morning that I pulled fifteen trips out of the dirt,

It must be less than 30 times before twelve o'clock, such a speed is simply not enough.

"You have to keep an accurate record of the truck numbers of their earth-pulling masters. Are you a match with them? If you make a mistake, it will be difficult to argue in the future." Chen Yang instructed the junior workers.

"Understood, boss!"

Chen Yang came to the place where the soil was loaded and took a look, not to mention that he had advanced three or four meters, but when he looked up at the location of the landslide, there were sediments sliding down every moment.

As long as there is not a large area of ​​mud and sand falling down, then there is no great danger. If it is sliding down piece by piece, then you must evacuate as soon as possible.

Once it slides down one by one, there is no way to run away, the only possibility is to be buried below.

A few minutes after twelve o'clock at noon, Chen Yang asked everyone to rest, because the aunt who cooked had already called him to say that it was time to eat.

After eating, everyone rested in the temporary residence until about two o'clock. Chen Yang arranged for everyone to continue to work. Now that time is tight, we can't give everyone extra rest time.

Even Chen Yang planned to work overtime at night, trying to pull all the soil from the landslide within four to five days, and then proceed to the next step.

In the afternoon, the speed of pulling the soil was a little faster, and each four-axle vehicle probably pulled it nearly ten times, but seeing where there were still piles of landslides, I felt that I really didn’t pull much soil away.

However, the overall road has been cleared to a distance of seven or eight meters, and the mountain seems to be very stable, and there will be no secondary landslides.

At about five o'clock in the afternoon, a four-axle truck broke the gear box while dumping soil, resulting in only five of the six four-axle trucks pulling soil.

However, this did not have a great impact on the progress of the construction. One excavator could not fit five four-axle trucks, so Chen Yang didn't say anything when one was broken, but just told him to fix it as soon as possible.

"Brother Chen, what time will you be working until this afternoon?" Hu Xiaojun jumped out of the car while queuing up to load soil and asked Chen Yang.

"Get off work at 7 o'clock!" Chen Yang said, "I plan to go back to work at 8 o'clock after dinner, and work overtime to try to finish pulling the landslide soil as soon as possible."

"Do you still work at night?" Hu Xiaojun said, "Anyway, I have no problem. I go out to make money. But other drivers don't know if they will work at night. Why don't I ask them later."

"Yes! In fact, the sightlines are not good at night. It is not necessary to use all the machinery. Only one excavator and three four-axle trucks are enough to remove all the soil in the safe landslide area. Tomorrow in the unsafe area It is processed during the day, and the rest can be rested." Chen Yang said.

"Brother Chen's idea is fine. I think the landslide area is not very stable. The bottom is digging and the top will slide down. Fortunately, it's just mud and sand. If there are big rocks, it will suffer."

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like