The Engineering Boss

Chapter 89 Landslide Rescue Project

January 1st, New Year's Day, the new year is coming.

Chen Yang originally wanted to take a good rest on New Year's Day, and take his sister around by the way, but he didn't know that a phone call from Zhou Xinjin last night made him clear.

But now there is a new project, Chen Yang has no time to rest, he has to work hard to win this emergency project.

Although Zhou Xinjin has agreed to let him do this emergency project, it is futile if the two parties have not agreed on the price. Zhou Xinjin cannot give Chen Yang to do it when he is losing money, so Chen Yang wants to make a profit if Zhou Xinjin does not lose money. Take this emergency project under the circumstances.

In addition, the contract for the construction of the teaching building in the No. 1 Middle School has been signed, but Chen Yang has not yet started to arrange the preliminary preparations. This also makes Chen Yang feel anxious and think about where he should recruit people to help.

After thinking about it, Chen Yang decided to transfer a junior administrator from the villa project to No. 1 Middle School to build a teaching building. As for the workers, Chen Yang could only transfer two junior workers from the villa project and the reservoir project, and let these five people form a group. The vanguard arranged the preparatory work in the early stage.

As for the shortage of workers for the villa project and the reservoir project, we can only recruit some local workers.

"Boom boom boom..."

"Who is it?" Chen Qin responded in the room.

"Your brother!"

The door opened, Chen Yang looked at his younger sister's messy hair and was speechless for a while. It was past eight o'clock in the morning and he was still sleeping in.

"Your brother is going to talk about things today, do you want to go with my brother or just stay in the hotel?" Chen Zai asked.

Chen Yang considered that the younger sister might feel particularly bored when he brought his younger sister to discuss things, so he might as well ask his younger sister for her opinion and see how she would choose.

"Brother is going to talk about things, so I won't go, I will do my homework in the hotel." Chen Qin replied, "Brother, when will you come back to talk about things?"

"I can't say for sure. Hurry up and maybe you can come back at noon. It's two hundred yuan. If you don't come back at noon, you can go buy some food yourself. By the way, the room fee will be renewed later. You don't have to worry about this." .” Chen Yang arranged.

"That's fine, bro, slow down." Chen Qin took Chen Yang's money and closed the door instantly.

Chen Yang came to the hotel lobby to renew the room fee, and then drove the off-road vehicle to the place where Zhou Xinjin arranged to meet.

However, before Chen Yang arrived at the destination, Zhou Xinjin called, telling Chen Yang that they might as well go to the scene to see the situation, and negotiate the price while watching the scene.

Chen Yang thought it was feasible, and he might have a better understanding of the situation after taking a look at the scene, so he drove the off-road vehicle to the national highway between Ninghui County and Qing County. After a while, Chen Yang saw Zhou Xinjin's car parked on the side of the road waiting he.

Zhou Xinjin told Chen Yang that there was still some distance to the landslide area, and it would take about 40 minutes by car to get there. Chen Yang felt that it was not that far away.

The two of them drove for about fifty minutes and finally arrived at their destination. They parked the car on the side of the road. When Chen Yang got out of the car and took a look, he saw the location of the landslide not far away.

"Look, Chen Yang, it's here!" Zhou Xinjin said, pointing not far away, "All the passing vehicles have been diverted to the village road, and there is a unilateral release every half an hour. Large trucks are basically unable to go. The village road, so we need to rush to repair it.”

After Zhou Xinjin finished speaking, he took out a stack of documents from the car and handed it to Chen Yang, who took it and opened it to read slowly.

Chen Yang read the information that the geology of this section of the landslide belongs to the surface cultivated soil, and the lower layer is sand and gravel. Due to the seepage of water from the cracks in a two-meter-wide irrigation canal above the landslide, the water in the canal seeps out and soaks the section for a long time. Mountains, eventually causing landslides.

At present, the irrigation canal above the landslide has collapsed due to the impact of the landslide, and the water in the irrigation canal has been blocked for a long time. Currently, there is no landslide on the mountain.

"Boss Zhou, I don't know how to deal with the landslide here?" Chen Yang asked.

The information in hand did not specify the specific treatment plan for the landslide. Only by giving a specific treatment plan can he carry out the construction according to the plan, which cannot be done according to his own wishes.

"The specific treatment plan has not yet been determined, but the above means that the sand and gravel soil from the landslide should be transported away as soon as possible, cleaned up, and then they will organize personnel to conduct on-site surveys, and formulate a specific treatment plan according to the actual situation on the site. "Zhou Xinjin said.

Chen Yang sort of understood that this emergency project is just one step before working out a solution plan for the next step, there is no complete solution plan at all, it just depends on the scene.

"Maybe the people above are afraid of making mistakes, so they can only do this for insurance. Boss Zhou, how should we negotiate this price?" Chen Yang asked.

Zhou Xinjin said with a smile: "I can't talk about it for the time being. We can only know after the confirmation from the higher authorities. But this does not affect the work. We will transport the sand and gravel away first. After the transportation, the next step is basically out. We will continue to work on it." Let's go. Don't worry, the money for this emergency project is easy to get, otherwise I wouldn't take the risk to do this kind of project."

"You think I ran for nothing in the past two or three days. I have taken care of the relationship between up and down. Now everyone knows the basic unit price, but we are not sure about the specific plan. As soon as the specific plan comes out, this emergency project The specific amount of money will be clear."

Chen Yang understood what Zhou Xinjin meant, and since that was the case, Chen Yang was not afraid of anything, just follow along.

I don't know if the system can predict how much the emergency project will cost, and how the emergency project system will perform tasks if I am going to do it next.

"Well, you have seen the situation at the scene, do you want to do it? The sand and gravel soil of this landslide is at least five or six thousand square meters. According to the current market price of more than eight yuan per square meter, it is probably close to four to five million yuan. "Zhou Xinjin laughed, "If the plan is to build a four- to five-meter-high retaining wall on the inside, and use anchor cables and shotcrete support on the top, it will cost two to three million yuan at least. More than three or four million."

Chen Yang laughed and said, "Why don't you do it, your boss Zhou is not afraid, what else should I be afraid of."

"Then you come down and quickly organize the machinery to enter the site. I only give you three days to prepare, and then try to finish pulling the sand and gravel soil in a week. After pulling, let them come to the site to have a look, and then formulate the next step. come out."

"No problem at all!"

At this moment, a transparent panel suddenly appeared:

[Main task announcement: Contract a project of more than 4 million yuan and organize personnel for construction]

[Rewards for project completion: tentative - waiting for project confirmation]

[Sub-task: within ten days (before January 10th) complete 10% of the contracted project progress】

[Completion reward: 10% of the project completion reward, one junior administrator, six junior surveyors, and six junior workers]

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like