The Engineering Boss

Chapter 108 The Situation on the Construction Site

It was already past 3:40 in the afternoon when Chen Yang came out of Mr. Yang's office. Since Mr. Yang was going to have a meeting with the general contractor in the afternoon, he left after talking about the matter.

When Chen Yang left the project department, the transparent panel of the system appeared in front of him:

[Main task: Contract a project of more than 2 million yuan and organize personnel to construct it-pipeline drinking water project]

[Reward for project completion: 2.4 million]

[Hidden task: Organize personnel to repair rural roads]

[Engineering task time: 20 days (January 30)]

[Hidden task completion reward: a pickup truck dedicated to engineering]

Hey, the hidden mission has appeared!

This is the second hidden mission of the pipeline project, and the reward for this hidden mission is only a pickup truck for engineering.

As long as the system has rewards, it is already very good for Chen Yang.

Moreover, Chen Yang is very short of means of transportation now, of course he is not short of it, because he himself has an engineering off-road vehicle, but the administrators under him do not, and it is very inconvenient to do anything.

What Chen Yang hopes is to be able to provide a car for each of his administrators. If he spends money to buy a car, Chen Yang is obviously unwilling. Chen Yang was very happy.

On January 10, Chen Yang followed his workers to the construction site to see the situation on site.

Chen Yang followed the junior administrator to the No. 1 main pipeline. The total length of this drinking water pipeline is more than six kilometers. After a period of non-stop work, there are only nearly two kilometers left to be buried.

Among them, the town piers and buttresses are all ready, and now only the embedding process is left, and the final acceptance can be carried out after the embedding is completed.

Chen Yang followed the junior administrator on the mountain road for more than 20 minutes and finally came to the construction site, and the arrival of Chen Yang made the local workers at work happy.

"How many workers were hired to lay the pipeline?"

There is a person every five or six meters along the pipeline. Most of them are holding tools such as picks, shovels, dustpans, etc., and they are all filling the pipeline with soil at the moment.

Chen Yang counted roughly, and there are at least ten people working in this short distance of sixty to seventy meters, and this is not counting the people who occasionally show their figures at the corners in the distance.

The junior administrator responded immediately: "Boss, there are twenty people today. I originally wanted to use an excavator to bury it, which would be faster. But when the excavator comes, it will take up a wider area, and may even It will damage the welded steel pipes, and it will also damage the land of the farmers who have not been acquired, which will cause a lot of trouble."

"Later, I thought about it, so I asked some local villagers to bury them. First, the land belonged to their village. Some local workers hired to bury the pipes in their own land consciously. They can't cause trouble for us. ; Second, I gave them a task, each person must bury 20 meters a day to be considered qualified, and whoever completes the burial first can leave work."

"Some time ago, we mainly made town piers and buttresses. It took more than half a month, and then we buried the pipes uniformly. According to this speed, the main pipes will be completed soon."

This method feels pretty good!

Today, 20 people participated in the work of laying the pipeline, each 20 meters long, so a 400-meter-long pipeline will be buried in one day.

Now there are less than two kilometers of pipelines left to be buried, and the burial of the No. 1 main pipeline will be completed in at most five days, and the rest will be the work of the branch pipelines.

Chen Yang chatted with the local villagers on the main pipeline before leaving, and then drove to the No. 1 branch line and No. 2 branch line pipeline to have a look.

Unfortunately, today Chen Yang met the group of workers who carried the steel pipes yesterday.

When he saw Chen Yang coming, the local villager who invited Chen Yang to eat pig-killing rice greeted him yesterday:

"Boss Chen, remember to come to my house tomorrow to eat pig-killing rice!"

Chen Yang smiled at him and said: "Okay, I remember. You have invited me twice, I am really embarrassed if I don't go! Where is your home, I will go to eat on time tomorrow."

"My home is in Caijia Village, the village where you paid your salary last time. I can see you when you come to our village chief. By the way, you bring all the people in your office with you." The enthusiastic villager said.

"I'm afraid this is not good. There are a lot of people in our office!"

There were about a dozen people in Chen Yang's office. It felt a little bad to have so many people go to someone's house to have a meal of killing pigs.

"What's wrong with it? It's just a few more pairs of bowls and chopsticks. It's okay. My family's New Year's pig this year weighs about 450 catties. It's enough for you to eat. At most, it's just two more tables."

Chen Yang looked at the villager's simple smile, and finally agreed to him.

Then Chen Yang followed the local villagers carrying the pipes on the No. 1 branch pipeline, and soon Chen Yang saw his two junior workers welding steel pipes, and three local workers beside him were assisting them in welding.

"Boss, you are here!"

"Well, you've worked hard! How many meters can you weld in a day?" Chen Yang asked.

One of the junior workers replied: "If you weld on a flat place, you can weld up to fifteen six-meter DN200 steel pipes a day; if you weld on a slope, you can weld up to twelve six-meter steel pipes a day. Steel pipes; if we weld on the cliff, we can weld up to ten steel pipes of about six meters in one day.”

Chen Yang felt that the welding speed was already very good. Taking the cliff section welding as an example, it would take at least half an hour to weld one pipe and connect two pipes together. More than half an hour, generally speaking, welding a pipe can not be done in an hour at the fastest.

"Be careful when welding."

After a few words of advice, Chen Yang walked forward for about 300 meters, and saw an excavator digging a pipeline, a junior worker was directing it, and Chen Yang also saw Liu Gong, a construction worker from the project department. Also here.

"Liu Gong, hello!" Chen Yang immediately went over to say hello, "Are you busy recently?"

"Oh, Boss Chen, you are willing to come to the construction site today to take a look. You said I am busy, and I feel a little annoyed walking around the construction site every day!" Liu Gong complained a little, "Fortunately, you asked The administrators here are pretty good, they helped me share some of the burden, otherwise the two teams above would definitely overwhelm me.”

Chen Yang smiled and said: "It's coming soon, the water intake point is almost completed, and the No. 1 main pipeline is also almost completed, and you will be much more relaxed then."

"I hope so! By the way, Boss Chen, I heard that the project funds are about to be allocated. Is it true?"

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like