On July 24th of the fourth year of Tianxuan, it has been five days since Su Yan returned to the Duchy of Tassels. On the main continent, the Duchy of Tassels and the six major kingdoms have been controlled by the Holy Land of Yicheng Territory. The military factories are also producing at full capacity. Yicheng Territory There are many wars, and the consumption of strategic materials is relatively huge.

It was also a while before Xuande returned to the holy land of Jidao. During this time, Xuande not only drove the countless military factories in Jidao to the ground, but also kept going back and forth between Gandao and Liandao. After all, these two islands are the basic islands of industrialization. There are relatively more military factories on the positioned islands.

To meet the needs of the navy to harass the coast of the Marquis of Jili, it means that all the military factories in Yicheng Territory, no matter the holy land or the main mainland, must operate at full capacity, which may not be able to meet the naval fleet's consumption of ship-borne ballista arrows. .

However, Qu Mao did not follow Xuande to fly around, but set off from Yidao in a leisurely manner, and went to outlying islands through the No. 1 Ziguang trail.

After exiting the entrance and exit of the underground passage from the north of the outlying island to the town, Qu Mao turned to walk towards the dam of the Lihe Reservoir.

About two hours ago, Qu Mao received a remote communication from Liu Qianhui, saying that Kong Ming had built a model of a windmill and asked Qu Mao to visit it.

Qu Mao opened the cheating system, but did not see any information about the rewards of cheating points, so Qu Mao thought it was a wonder, and decided to go to the outlying islands to see for himself.

Just after turning off the road to the Lihe Dam, Qu Mao saw a four-leaf windmill turning slowly on the Lihe Dam.

From a distance, the height of the blades of this windmill is about 9 meters. The 9-meter-high windmill was considered a spectacle when the construction technology in Yicheng territory could only build five-storey buildings.

From a distance, Qu Mao could see crowds of people on the dam of the Lihe Reservoir, and there were residents everywhere who came to watch the excitement.

Walking up the water retention dam of the Lihe Reservoir, the residents who watched the excitement saw Qu Mao coming, and quickly gave way to a passage.

Only then did Qu Mao see it more clearly. The entire windmill has a stone base with a wooden impeller at the top. The base and the mill are only about 7 meters high, but the wooden impeller of the windmill is about 2 meters long and 10 centimeters wide.

Now the wind on the dam of the Lihe Reservoir is not strong, but the impeller is slowly rotating, driving the transmission shaft, and a stone grinding disc outside the base is rotating slowly, and the wheat passes through the feeding port at the upper end of the grinding disc Once inside, it falls out in the form of flour from around the millstone.

The water-blocking dam was crowded with people, and the residents who watched the excitement were amazed.

When Kong Ming and Liu Qianhui saw Qu Mao coming, they hurried over to salute and say hello.

Turning his head and pointing to the windmill, Kong Ming said triumphantly, "My lord, what do you think? You have come here in person in less than two hours since the subordinate notified you."

Qu Mao nodded and said: "Well, it's very good, I'm very satisfied. The wind today is actually not strong, but I can see that the impeller is still rotating. This wind can grind wheat. If the wind is stronger, it can be used as industrial power."

Kong Ming nodded and said, "My lord, I feel that the mechanical principle of this thing is actually not complicated.

The reason why the subordinates were able to build the model so quickly was mainly because of the use of water-powered transmission facilities.

It's just that the hydrodynamic facility is that the water flow hits the impeller to form the power of rotation, which is then transmitted, but this thing is driven by the wind to blow the impeller, thereby forming the power of rotation. In fact, as long as the power is transmitted, it can completely replace the water power. . "

Qu Mao looked at Kong Ming suspiciously. Kong Ming dared to brag about something that the cheating system has not yet recognized.

Kong Ming continued: "My lord, under the premise of zero foundation, it took less than 20 days to realize your vision, because the internal structure is similar to water power."

At this time, the yellow font of the cheating system appeared on Qu Mao's retina again. The cheating system not only rewarded Qu Mao with a large amount of cheating value for the model of the windmill mill, but also digitized the model. A windmill construction blueprint was generated for Qu Mao.

The cheating system has not generated construction drawings or construction drawings for Qu Mao for a long time, so that Qu Mao even forgot that the cheating system has this function.

Thinking of this, Qu Mao directly smashed the generated windmill construction blueprint into the territory building panel, and said to Kong Ming: "Kong Ming, you have worked hard, and you are really talented in machinery.

How about this, the Institute of Hydrodynamics will be renamed as the Institute of Power in the future, and some other power facilities in the future can basically follow this idea.

Kong Ming, I think the researchers of the windmill mill and water power facility should write the principles into textbooks as soon as possible and send them to the five universities on Zhidao for students to learn. "

Kong Ming said with a smile: "It's all the whimsy of the adults..."

Liu Qianhui interrupted in dissatisfaction: "Grandma, Qu Mao, my wife has been busy with Kong Ming on the outlying island for 20 days. The model of the windmill mill has contributed a lot. Why don't you praise me?"

Qu Mao looked back at Liu Qianhui and said, "Liu Qianhui, you have worked hard too."

Liu Qianhui curled her lips, and said dissatisfiedly: "Grandma, you're so frankly perfunctory."

Kong Ming burst into laughter, and the surrounding residents also wanted to laugh but dared not.

Qu Mao turned around and said to the residents: "Let's go away, there's nothing to see. More mills will be built in the Holy Land to help residents use them to grind wheat and rice. What a novel thing, it can only help everyone , can play a real role, otherwise it is just a decoration.”

The surrounding residents immediately cheered.

Naturally, Qu Mao did not forget that there are already construction drawings of windmill mills on the construction panel of Yicheng territory. Dang even took out the magic communication crystal and contacted Su Qiaoer, asking Su Qiaoer to build a large number of windmill mills as soon as possible in the places where the folding space is reserved in Liandao and Kongdao .

In the past, rice husking in Yicheng territory was basically done manually by residents, and the efficiency was not even comparable to the harvesting efficiency of the lord's hut's own arable land. With the windmill mill, the efficiency of rice husking is bound to increase greatly.

Su Qiaoer said in the remote communication that she will arrange this matter immediately, and that some convenient windmills will be built on the islands with cultivated land. After all, the construction cost of a windmill is not high.

Seeing that Qu Mao had finished making arrangements, Kongming said, "My lord, now that the windmill mill has come to an end, why don't you go to your subordinate's house for lunch?"

Qu Mao nodded and said, "Alright, let's go together, Liu Qianhui, to Kongming's house for dinner."

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like